Research on whole-cycle cost dynamic control and cost optimization strategies of housing maintenance and renovation projects
房屋维修改造项目全周期成本动态控制与造价优化策略研究

作者: 杜伊鑫 *

中原石油勘探局有限公司房地产管理中心 河南濮阳

*通讯作者: 杜伊鑫,单位:中原石油勘探局有限公司房地产管理中心 河南濮阳 ;

发布时间: 2026-04-22 总浏览量: 51

摘要

在我国城市更新与存量资产提质改造持续推进的背景下,房屋维修改造项目数量快速增长,项目呈现单体规模差异大、现场条件复杂、变更签证频发、成本管控难度高等特征。传统静态成本管理模式难以适配维修改造项目全生命周期的不确定性,易出现预算超支、效益偏低、资源配置不合理等问题。为提升项目经济性与管理精细化水平,本文以房屋维修改造项目为研究对象,基于全周期管理理论与动态成本控制思路,梳理项目各阶段成本构成与管控要点,采用文献研究法、案例分析法、动态跟踪法,识别当前成本控制核心痛点。研究构建全周期成本动态控制体系,提出针对性造价优化策略,结合实际案例验证其有效性,为同类项目提供理论参考与实践路径,推动项目从被动核算向主动管控转型。

关键词: 房屋维修改造;全周期成本;动态控制;造价优化;成本管理

Abstract

Against the background of the continuous promotion of urban renewal and quality improvement of stock assets in China, the number of housing maintenance and renovation projects is growing rapidly. These projects are characterized by large differences in single-unit scale, complex on-site conditions, frequent changes and visas, and high difficulty in cost control. The traditional static cost management model is difficult to adapt to the uncertainty of the whole life cycle of maintenance and renovation projects, which is prone to problems such as over-budget, low efficiency and unreasonable resource allocation. To improve the economic efficiency and refinement of project management, this paper takes housing maintenance and renovation projects as the research object, based on the whole-cycle management theory and dynamic cost control ideas, combs the cost composition and control points of each stage of the project, adopts literature research, case analysis and dynamic tracking methods to identify the core pain points of current cost control. The study constructs a dynamic cost control system covering the whole project cycle, puts forward targeted cost optimization strategies, verifies its effectiveness with actual cases, provides theoretical reference and practical path for similar projects, and promotes the transformation of projects from passive accounting to active control.

Key words: Housing maintenance and renovation; Whole-cycle cost; Dynamic control; Cost optimization; Cost management

参考文献 References

[1] 张敏.房屋养老金制度提速:存量时代的老旧小区改造新解法[N].21世纪经济报道,2024-08-27(001). 

[2] 苟国朋. 乡村振兴背景下的老旧砌体房屋加固改造设计探究[J].建设科技,2024,(16):70-72.

[3] 陈顺. 建筑节能施工技术在老旧城区房屋改造中的应用探讨[J].建设科技,2024,(16):73-75.

[4] 密向磊.农村危房改造政策实施效果农户满意度调查研究[D].西安建筑科技大学,2024. 

[5] 白玉冰,马粮,朱琳,等. 浅谈砖混结构房屋改造加固设计方法[J].建设科技,2024,(14):90-92.

[6] 陈莳. 广州市老旧残代管房屋维修改造管理探究[J].广州建筑,2024,52(04):90-92.

[7] 赵子恒.北京老城四合院房屋节能改造实测与模拟研究[D].北京建筑大学,2024. 

[8] 杨亚鲁. 旧城区房屋改造中的建筑节能施工技术探讨[J].中华建设,2024,(03):128-130.

引用本文

杜伊鑫, 房屋维修改造项目全周期成本动态控制与造价优化策略研究[J]. 工程学研究, 2026; 5: (2) : 61-63.