Open Access Article
Journal of Engineering Research. 2025; 4: (8) ; 9-11 ; DOI: 10.12208/j.jer.20250351.
A BIM-based dynamic management method for the whole-life-cycle cost of ship repair and construction
基于BIM的船舶修造全生命周期成本动态管理方法
作者:
吴松 *
启东惠生海工装备有限公司 江苏南通
*通讯作者:
吴松,单位:启东惠生海工装备有限公司 江苏南通;
发布时间: 2025-08-15 总浏览量: 79
PDF 全文下载
引用本文
摘要
船舶修造行业在市场竞争和技术发展的双重压力下,对全生命周期成本的精细化管理提出了更高要求。基于BIM的船舶修造全生命周期成本动态管理方法,通过在设计、建造、运营、维护等阶段引入信息化手段,实现数据的集成与动态更新,从而提高成本控制的科学性与实时性。该方法不仅能够有效识别各阶段的成本风险,还能为资源配置和决策优化提供依据,推动船舶修造企业向数字化与精益化转型。利用BIM技术建立全生命周期成本动态管理模式,可以在保证工程质量与安全的前提下,实现成本的动态平衡与优化,为船舶修造行业可持续发展提供可行路径。
关键词: BIM技术;船舶修造;全生命周期;成本动态管理
Abstract
Under the dual pressures of market competition and technological development, the ship repair and construction industry has put forward higher requirements for the refined management of whole-life-cycle costs. The BIM-based dynamic management method for the whole-life-cycle cost of ship repair and construction realizes the integration and dynamic update of data by introducing information-based means in the stages of design, construction, operation, maintenance, etc., thereby improving the scientificity and real-time performance of cost control. This method can not only effectively identify cost risks at various stages but also provide a basis for resource allocation and decision optimization, promoting the transformation of ship repair and construction enterprises towards digitalization and lean management. Establishing a dynamic management model for whole-life-cycle costs by using BIM technology can achieve the dynamic balance and optimization of costs on the premise of ensuring project quality and safety, and provide a feasible path for the sustainable development of the ship repair and construction industry.
Key words: BIM technology; Ship repair and construction; Whole life cycle; Dynamic cost management
参考文献 References
[1] 姜天际. 船舶修造企业常见危险作业管理要点分析[J].船舶物资与市场,2025,33(05):103-105.
[2] 赵鑫有. 基于BIM技术的船舶舾装三维设计与应用[J].船舶物资与市场,2025,33(03):10-12.
[3] 王晓伟,王章,徐四一. 基于GIS+BIM+数字孪生技术的海域勘察数字管理平台研发及应用[J].岩土工程技术, 2025, 39(02):159-166.
[4] 陶伟,李文俊,闫晓敏. BIM+GIS船机实时监测技术在远海港区建设中的应用[J].水运工程,2025,(02):211-217.
[5] 苏郁葱.基于BIM技术斜拉桥参数化建模与二次开发应用研究[D].内蒙古科技大学,2024.
[6] 孙俊锋. BIM+GIS技术在内河智慧航道建设中的应用[J].现代交通技术,2023,20(06):90-94.
[7] 柯刚,熊元元. 基于BIM的船舶建造方法研究[J].船舶标准化与质量,2023,(06):39-42.
[8] 王彩君. 基于BIM的桥梁检测与安全评估研究[J].黑龙江交通科技,2023,46(08):74-76.
引用本文
吴松, 基于BIM的船舶修造全生命周期成本动态管理方法[J]. 工程学研究, 2025; 4: (8) : 9-11.